RLC // SECURE_PORTAL.v26 STATUS: ACCESS_GRANTED

Section 1: The Instrumentation (What We Measure)

We do not guess. We utilize clinical-grade diagnostics to separate how a leader feels from how they function:

  • The C-I Score™: A 100-point audit of the 5 Cylinders of Capacity. This is your fuel gauge.

  • The RRLAS™: A Resilient Red Light Alert System designed to detect and interrupt behavioral drift before it becomes a breach.

  • Pressure Displacement Analysis: Identifying where your 10-ton professional load is currently being shunted onto a 5-ton emotional frame

Physics is indifferent to your calling

Leadership is a high-altitude crossing. Most leaders attempt to optimize performance while their internal architecture is failing. When internal capacity is exceeded for too long, collapse is not a character flaw it is a math problem.

The most significant risk to your organization is the structural failure of its primary leader. When a high-torque man collapses, the organization pays a 10x tax in momentum loss, relational damage, and institutional instability.

Section 2: The Protocol (How We Protect)

This is a 12-month Executive Retrofit conducted under a Blind-Trust Protocol:

  • The Confidentiality Shield: The Board funds the protection of the asset; the Guide protects the privacy of the man.

  • Total Data Privacy: No internal data or raw diagnostics are shared with the organization. The Board receives a "Structural Integrity Clearance" only.

Section 3: The Entry Point

Phase 1: The Leadership Structural Audit™ Investment: $250 Output: A 14-day telemetry baseline and a private Technical Briefing.

INITIALIZE AUDIT